Modern high-rise mixed-use tower
New Design Traffic Analysis

45-Storey Mixed-Use Tower

Jeddah, Saudi Arabia

VT design for a prestigious mixed-use development comprising commercial offices, boutique hotel, and luxury residential. Sky-lobby concept with destination dispatch.

Our team developed a comprehensive vertical transportation strategy that maximised shaft utilisation through a sky-lobby transfer system. By implementing destination dispatch technology across all elevator groups, we significantly reduced average wait times while future-proofing the system for tenant growth. The design achieved an optimal balance between passenger experience and construction cost efficiency.

25s
Avg Wait Time
15%
Shaft Space Saved
20%
Growth Capacity
Commercial office building with modern elevator systems
Modernization Compliance

Commercial Office Complex Modernization

United Kingdom

Comprehensive modernization strategy for 20-year-old 8-elevator commercial complex. Phased controller replacement with zero tenant displacement.

We conducted a full condition survey and traffic analysis of the existing installation to identify the most impactful upgrade path. Our phased modernization programme replaced controllers, door operators, and car fixtures in a carefully sequenced rollout that maintained minimum service levels throughout. The result was a dramatic reduction in breakdown frequency and a significant improvement in energy performance, all while keeping every tenant fully operational.

85%
Breakdown Reduction
35%
Energy Savings
22s
Avg Wait Time
Modern hospital building exterior
Traffic Analysis Optimization

Regional Hospital Elevator Optimization

Saudi Arabia

Traffic analysis and reconfiguration of 12-elevator hospital system. Resolved congestion during shift changes without replacing any equipment.

The hospital experienced severe elevator congestion during nursing shift changes and peak visiting hours, with wait times regularly exceeding three minutes. Through detailed traffic logging and simulation modelling, we identified opportunities to re-zone elevator groups, adjust dispatching parameters, and implement priority service protocols. These software-level and operational changes eliminated the bottleneck at a fraction of the cost of equipment replacement, delivering immediate results.

55s
Peak Wait Time (from 3.5min)
95%
On-Time Transport
5%
Cost vs Replacement
Client Feedback

What Our Clients Say

Doug & Danny provided exceptional insight during our tower project. Their traffic analysis was thorough and data-driven, and their design recommendations saved us significant shaft space without compromising passenger experience. We would not hesitate to engage them again on future developments.

P
Project Manager
Leading Developer, Jeddah

Have a Similar Project?

Let us show you how our expertise can deliver measurable results for your vertical transportation challenges.